News

Dam Repair Complete


As of 12/14//2015, the dam repair work has been completed.

Some detai about the work during the fall, 2015:

 

10/7/15 -  concrete blocks have been delivered to the dam and the dam is dismantled for the repair work to begin shortly; expect the repair work to be done later ini the week;  parts necessary to complete the work have been ordered

 

10/9/15 - no new progress on the dam repairs

 

10/27/15 - most of the repairs have been completed as far as the installation of the new wood pieces: the side brackets, the lower mount and the gate have been installed.  Barry still needs to install the mechanism to raise and lower the gate.

 

12/14/15 - the dam repair work is complete and the pond level is rapidly raising